Standard line striping, ADA-compliant accessible layouts, fire lane markings, traffic flow arrows, and stall numbering, all per California Title 24 and federal ADA requirements. Most commercial lots completed over a single weekend.
Every parking lot scope, handled in-house. We don't subcontract striping on our paving jobs, the same crew that paves the lot stripes it.
Parking stall lines for commercial, retail, and industrial lots. Traffic-grade waterborne paint in standard white or yellow. Layout optimized for maximum stall count within your site dimensions and drive aisle requirements.
Accessible stall placement, van-accessible stall designation, 5-foot minimum access aisles, international accessibility symbol stenciling, and approach path striping, per California Title 24 and federal ADA requirements.
Red curb or painted fire lane boundaries per Los Angeles Fire Department code requirements. "No Parking, Fire Lane" lettering and cross-hatching to maintain required fire apparatus access clearances.
Directional arrows, stop bars, crosswalks, and lane delineation for parking lot circulation. Critical for preventing internal traffic conflicts and supporting safe pedestrian movement across drive aisles.
Assigned stall numbers for apartment complexes, commercial garages, and multi-tenant facilities. Sequential or custom numbering per property management layout requirements.
Faded line restoration over existing layouts with minimal layout changes, or full relayout for reconfigured sites. ADA compliance assessment included before restriping, existing non-compliant layouts flagged and corrected.
Faded accessible stall markings and non-compliant layouts are an active liability in California. ADA complaints filed with the Department of Justice or via private right of action don't require a plaintiff to have visited your lot. We stripe to the current standard and provide documentation.
Every ADA striping job includes a written layout diagram confirming accessible stall count, dimensions, and placement relative to your building entrance, available for tenant, property manager, or building department records.
Most commercial seal coating and striping jobs are scheduled Friday night through Sunday to avoid a single lost business day. The lot is paint-dry and open before Monday morning traffic arrives. Call us to discuss your operational window.
Tell us your lot size and what's needed. We respond within one business day and can schedule weekend work to avoid disrupting your operations.